Dolores Bengtson Aquatics Center Completion

Pleasanton's popular Dolores Bengtson Aquatic Center is getting a renovation! The project focuses on the west side of the facility where three of the four pools are currently located. The east side of the facility will remain open for regular programs (see links below for specific programs, dates, times and fees.
Renovation plans include:
Demolition of the existing diving pool
Incorporation of a new diving pool into the existing 25-meter pool by way
of an 'L-shaped' design
Replacement of the existing pool decking
Re-plastering the 25-meter and training pools
Updating the Americans with Disabilities Act (ADA) access to both pools
Deepening of the 25-meter pool through a rim flow gutter system
Replacing the original plumbing, heating and electrical systems of both pools
Separating the filtration systems so that the two pools function
independently
The 25-meter pool, diving pool and activity pool with water slide will be closed throughout the renovation, which is expected to take about one year. The large 50-meter pool on the east side of the facility will remain open during most of the year with some minor repairs to decking. It will continue to be used for lap swim, water exercise, swim lessons, swim teams and competition.